Our haul-out was delayed due to weather.
Two days ago...
Major tasks:
1. Antifoul
2. Top sides paint - make respectable
3. Alter exhaust system, reinstall engine.
4. Repair bow, damaged by bow sprit
5. Repair port side stern planking, which has partly sprung
6. Fix cabin top and window leaks
Bow damage (note the down angle of bow platform):
Bow rail removed.